Hospital Universitario de Cuenca
At a glance: 5 hospitals · 31 operating rooms · in-wall OR integration, control panels and surgery timers · 2024–2026

The challenge
The new Hospital Universitario de Cuenca, part of the Castilla-La Mancha health service (SESCAM), needed its 14 operating rooms finished as a single, clean wall: imaging, the surgical PC, room controls and timers built in flush, with nothing on carts. The design also had to be repeatable, so later hospitals in the region could order the same room.
What we installed in each operating room
How it works
All four units sit in one flush wall frame, installed by the construction contractor during fit-out and commissioned by CureVision engineers on site. Surgeons see PACS and live video on the 4K display; the circulating nurse runs records on the PC and checks room conditions on the control panel without leaving the sterile field's line of sight.
The outcome
Cuenca's 14 rooms were commissioned in November 2024, ready for the hospital's opening to patients on 29 July 2025. The same room design was then ordered for hospitals in Albacete (9 rooms, with 5 more ordered in 2026), Puertollano (6 rooms, delivered July 2026), Hospital Universitario Reina Sofía in Córdoba and Hospital Universitario de La Princesa in Madrid.
Planning a similar project?
We can connect you with the team that delivered it.